Electromagnetic Design and Optimization of Electromagnetic Launchers (Phase III)

Project Type: ASELSAN

Project Budget: 860.000 TL

Project Duration: 15 months

Brief Summary:

Third phase of the TUFAN railgun project in which a 10 MJ prototype will be tested. Detailed 3D FEA models are developed to obtain electrical, mechanical force, and thermal characteristics of the railgun.

The following are the main topics under this project:

  • Finite Element Analysis
  • Multiphysics Simulations (Electromagnetic analysis coupled with thermal or structural analysis)
  • Electrical Machine Design
  • Pulse Power Supplies and Topologies

If you are interested with the project, please contact Nail Tosun (C-114) or Dr. Ozan Keysan (C-113).

News on Media

railgun1 railgun2